The operation of Metro Line 1 (Ben Thanh – Suoi Tien) and plans to develop Transit-Oriented Development (TOD) areas are reshaping how the Ho Chi Minh City real estate market evaluates location advantages. Property values are increasingly linked to transport connectivity, travel times, and the quality of the urban environment. However, opportunities lie not merely in owning land near metro stations, but also in the ability to develop projects that comply with planning requirements, have a viable legal framework, and meet actual market demand.
Table of Contents
1. How Metro Is Changing the Way the Market Values Real Estate
Traditionally, real estate values have been assessed based on proximity to the city center, frontage along major roads, and access to amenities. As the urban rail network expands, connectivity and travel time are becoming increasingly important factors in residential location decisions.
Market data along Metro Line 1 shows that apartment asking prices within a 1-kilometer corridor along the metro line and Hanoi Highway increased from approximately VND 30.6 million per square meter in 2016 to VND 72.9 million per square meter in 2026, equivalent to nearly 2.4 times the 2016 level. In 2025 alone, asking prices in this area rose by approximately 30% year-on-year. These figures are asking-price data compiled from Batdongsan.com.vn and should not be interpreted as actual transaction prices for all apartments in the area.
Several developments, including Masteri Thao Dien, Gateway Thao Dien, Vinhomes Golden River, and Thao Dien Pearl, have recorded significant price increases compared with their initial launch prices. However, appreciation has varied from one project to another. This indicates that metro connectivity is not the sole determinant of real estate value. Location, project quality, amenities, initial pricing, and the overall level of area development remain important factors.
The market must also look beyond geographical proximity to metro stations. A project located near a station but lacking convenient pedestrian access may have less of an advantage than a development farther away that offers direct, safe, and convenient connections.
2. Emerging Trends in the Real Estate Market Along Metro Corridors
According to research by a team of authors from the Vietnamese-German University on housing along Metro Line 1, land prices along the metro corridor increased by approximately 150–300%. Of the 60 residential projects surveyed, only 12 were classified as mid-range or affordable housing. Notably, within an 800-meter walking catchment area around metro stations, only 2 out of 36 projects met the criteria for social housing or affordable housing. These findings were presented at the 2026 International Conference on Sustainable Urban Development. The figures should be interpreted within the scope and criteria of the study and should not be considered representative of the entire housing supply in Ho Chi Minh City.
These findings highlight a significant challenge: public transport infrastructure is developed to serve the wider population, yet rising property prices around metro stations may make housing in these areas increasingly unaffordable for certain groups of residents.
From a planning perspective, Ho Chi Minh City is gradually translating the TOD model into concrete planning initiatives. According to updates available as of November 2026:
Five TOD areas along Metro Line 2, on the Ben Thanh – Tham Luong section, cover a combined area of approximately 939.18 hectares. Their boundaries have been approved, and planning work is underway.
Eight TOD areas or clusters associated with 12 stations along Metro Line 1 have been submitted by the Department of Planning and Architecture for boundary approval. The relevant dossiers are currently being finalized.
The Thu Thiem TOD area, covering approximately 246.44 hectares, has received boundary approval, and its TOD plan at a scale of 1:2,000 is being prepared.
It is important to distinguish between approval of planning boundaries, approval of detailed planning schemes, and investment approval for individual projects. These are separate stages in the TOD implementation process.
3. TOD Opens Up a New Direction for Real Estate Development
Transit-Oriented Development (TOD) is an urban development model centered on public transport. Under this approach, residential, commercial, office, service, and public spaces are planned and integrated around major transport hubs.
Unlike an individual real estate project simply located near a metro station, TOD aims to create integrated urban environments that improve access to public transport and connect different land-use functions.
Under Resolution No. 56/2026/NQ-HDND, the planning boundary of a TOD area includes the railway station or depot and its surrounding area within a maximum distance of 1,000 meters from the conventionally defined center of the station or depot. However, the specific boundary also depends on natural conditions, administrative boundaries, block boundaries, the transport network, station accessibility, and existing site conditions. It is therefore not automatically defined as a uniform 1-kilometer circle applicable to every parcel of land.
The resolution also establishes mechanisms for adjusting certain planning parameters within TOD areas. Specifically, the gross floor area ratio (FAR) for designated functional blocks planned for mixed-use, commercial and service, and residential purposes within TOD areas may be increased by up to 1.5 times the levels prescribed under the National Technical Regulation on Urban and Rural Planning. Social infrastructure standards may be reduced by up to 50% compared with the regulatory requirements, with provision made to balance these standards across all TOD areas along the railway line. The required area for parking facilities may also be reduced by up to 50% compared with the applicable regulations. These provisions are stipulated in Article 5 of Resolution No. 56/2026/NQ-HDND.
These mechanisms apply during the TOD planning process in accordance with relevant regulations. They do not automatically apply to every parcel of land located within 1 kilometer of a station. The specific planning parameters remain subject to the approved planning scheme and the relevant authorities' approval.
Importantly, being located within a TOD planning boundary does not automatically mean that a land parcel will be subject to compulsory acquisition or that its owner is entitled to develop a project. TOD planning boundaries, land acquisition procedures, and development rights are separate legal matters that must be assessed under the relevant regulations.
4. Opportunities Must Be Supported by Project Feasibility
For real estate developers, the advantages offered by metro connectivity should be assessed throughout the entire project lifecycle, from land acquisition and project research to development and operation.
Market considerations: Developers need to identify their target customer segments, including employees, young families, students, professionals, and tenants. Each area requires a different product mix. High-end apartments should not be assumed to be the appropriate development model for every metro station area.
Planning and legal considerations: Developers should verify approved TOD boundaries, land-use planning parameters, land availability, existing ownership status, and the progress of planning approvals. Investment proposals should not incorporate planning indicators or development rights that have yet to receive approval from the competent authorities.
Financial considerations: Land value should not be determined solely by expectations surrounding metro development. Developers need to establish different investment scenarios and carefully manage land costs, site clearance and compensation expenses, construction costs, borrowing costs, and implementation timelines. Price increases recorded by projects in areas where metro services are already operational cannot be directly used to forecast the profitability of new developments.
Design and operational considerations: Projects should prioritize pedestrian connections to metro stations, public spaces, commercial and service facilities, and efficient internal traffic organization. Mixed-use development can only be effective when supported by actual market demand and an appropriate operational strategy.

5. Key Considerations Arising from Metro and TOD Development
Based on market data and planning developments, five important observations can be drawn:
1. Real estate value is determined by more than proximity to a metro station.
Employment opportunities, commercial and service ecosystems, and last-mile connectivity directly affect the convenience and practicality of using metro services.
2. Affordable housing remains a significant market gap.
The finding that only 2 out of 36 surveyed projects around Metro Line 1 stations met the criteria for social or affordable housing highlights an issue that needs greater attention in urban planning and residential development.
3. TOD is closely linked to urban financing.
Capturing the increase in land value around metro stations can potentially generate funding for infrastructure reinvestment. However, this requires an appropriate legal framework and transparent mechanisms for distributing the resulting benefits.
4. Planning and infrastructure progress determine project viability.
Approval of a TOD planning boundary does not mean that the planning scheme has been approved or that projects can immediately proceed. Coordination between transport systems, technical infrastructure, and real estate development is essential.
5. Development and operational capabilities create long-term competitive advantages.
Developers need more than land reserves. They must also possess the capabilities to undertake planning, design, cost management, product development, and asset operations.
6. From Standalone Projects to Integrated Urban Development
In the long term, the expansion of the metro network and the implementation of TOD areas may reshape how developers select land, structure their product portfolios, and mobilize investment capital.
Rather than focusing exclusively on property sales, developers may explore integrated models that combine residential, office, commercial, and service functions. They can also phase investments in line with infrastructure development schedules and retain a portion of their assets for rental operations when financially viable.
The success of TOD also depends on striking a balance between investment efficiency, housing affordability, and urban quality. This balance is essential to ensuring that real estate values are sustained by genuine demand and practical use, rather than rising solely on expectations surrounding future planning and infrastructure developments.
Conclusion
Metro development is helping reshape the way the real estate market assesses property values, with connectivity and urban quality becoming increasingly important considerations. However, infrastructure advantages can only be translated into lasting value when supported by coordinated planning, a clear legal framework, appropriate property products, and effective operations. For real estate developers, long-term opportunities lie not simply in owning land near metro stations, but in their ability to create integrated urban environments that deliver lasting use value and sustainable cash flow.